Scope

  • Connect existing GRC 10.1 Access Controls solution to an existing SAP HANALIVE DB via HANA Studio environment

Timeline

  • Deployed in 2-5 Days

Prerequisites

  • GRC 10.1 AC and SAP HANA Studio must already be deployed at the correct patch levels

  • GRC HANA plugin must already be deployed at the correct patch level*

*RapidGRC can assist with this step if required. However, this element must be completed in advance of our RapidTrack HANA Edition service.

HANA EDITION

Covering

  • Configuration will allow user provisioning to SAP HANA DB via HANA Studio

  • Configuration will allow assignment of SAP Analytic Privileges to users in SAP HANA DB via HANA Studio